From:                              route@monster.com

Sent:                               Monday, October 26, 2015 10:55 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: drive tseter

 

This resume has been forwarded to you at the request of Monster User xapeix01

SYLVESTER JACKSON 

Last updated:  06/02/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Carrollton, TX  75006
US

Mobile: 2149956149   
Home:
214-995-6149
sylverj66@yahoo.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: LTE RT2 / RU2

Resume Value: ghsumrqvfch6sdwq   

  

 

SYLVESTER JACKSON

2810 E. Trinity Mills Rd #209

Carrollton, TX. 75006

(H) 214-995-6149

sylverj66@yahoo.com

sylverj66@gmail.com

 

TECHNICAL SUMMARY:

·         NORTEL CDMA HS1 CERTIFICATION  2012

·         ERICSSON LTE RBS 6000 CERTIFICATION 2010

·         ERICSSON RTU2 CERTIFICATION 2008

·         NOKIA FLEXI CERTIFICATION 2008

·         TRUE POSITION/LMU Certification

·         SMU School of Engineering and Applied Sciences (UNIX System Administration, SUN SOLARIS 2.x / Solaris 7) Dallas TX.

·         Richland College- (Networking Technologies, Microsoft) Dallas, TX

·         ATI Electronic Institute (Electronic Engineering Technology) Dallas, TX

·         United States Navy (Aviation structural mechanic) 1984 – 1988

EXPERIENCE

 

9/2013- 11/2013  Ericsson LTE 6000 Series Integrator Prithvi

·         Commissioning/Integration of RBS6201V2, 6201

·         2nd Carrier Integration, Call Testing.

·         Call Test, E911

·         NEA External Alarm Testing (2 alarms indoor – 6 alarms outdoor)

·         Troubleshoot any alarms available.

·         Knowledgeable in RBS6000 LTE eNodeB(6601, 6102,6201).
 

11/2012 -10/2013    Ericsson LTE 6601 Integrator AVION

·         Commissioning/Integration of RBS6201V2, 6201, 6601O MT(41H/43A/44J), OSS-RC.

·         Call Test, E911

·         NEA External Alarm Testing (2 alarms indoor – 6 alarms outdoor)

·         Troubleshoot any alarms available.

·         Knowledgeable in RBS6000 LTE eNodeB(6601, 6102,6201).
• Operation & Maintenance of RBS6000 Nodes(RUW/RUS, DUW/DUG troubleshooting) using CPI ALEX, Primus
• License Key Activation using OSS SMO, Local License Keyfile download, Emergency License Activation

·          

1/2012 – 11/2012  Ericsson LTE 6601 Integrator  WNG

·         Commissioning/Integration of RBS6201V2, 6201, 6601OMT(41H/43A/44J), OSS-RC. Knowledgeable in RBS6000 LTE eNodeB(6601, 6102,6201).
• Operation & Maintenance of RBS6000 Nodes(RUW/RUS, DUW/DUG troubleshooting) using CPI ALEX, Primus
• License Key Activation using OSS SMO, Local License Keyfile download, Emergency License Activation

12/2011 – 1/2012   Sprint 6102 LTE CDMA NetVersant

·         Rbs 6102 cabinet for the Sprint network Vision Project.. LTE CDMA Installed the PSU’s, CBU CEEM, DBA, DUL, XMU Powered units up, connection of the GPS Units, Troubleshoot Alarms.

8/2011 – 10/2011     7705 Router Install and Commissioning TMOBILE

·         Complete install of the Alcatel 7705 Router, ran Power, 24v connection, connected the Ethernet to the JDSU NID, Ran LMU Sync Cable, 7705 SPF connection, Commission and Test with the NIC

11/2010 – 7/2011  Ericsson Umts /  United Commtel

·         OBIF 3rd Carrier Installation and Integration

·         Installation Commission Ericsson Node B 3106, 2106 cabinets. OSS, RNC/RXI, Node B, MGw, Moshell 7.0, HyperTerminal, Element Manager Experience. Operation and maintenance, and troubleshooting. Integration of Node B/RNC and alarm monitoring. Integration support, O&M and Troubleshooting; RNC3810, RBS3106 Site Integration

3/2010 – 11/2010  Ericsson Umts / LTE installer/Integrator Avion

·         Sites contain UMTS RBS cabinets such as LTE 6000, 3106, 3206

·         Isolate and resolve complex issues at the BTS cell sites with patience and ease   
Conduct routine preventative maintenance to insure equipment is up to par in case of emergency
Provide expert advice and coaching to less experienced technicians

11/2009 – 3/2010 Nokia Flexi BTS Installer/Integrator   Mycom             

·         Call testing, integration and commissioning in several markets for T-Mobile-Nokia (Nokia Flexi BTS)

·         HSPA 2nd carrier Extension module installation and Integration

               Installation, troubleshooting and repair on Nokia Flexi BTS equipment including but not limited to: RF Modules (FRIA & FRIB), System Modules (FSMA), System Sub Modules (FTIA). Repair and maintenance on FPMA, FPAA, FCOA, FCIA, etc. Configure BTS using Nokia BTS Manager

10/2009 – 11/2009    Drive tester G-corp Inc.  

·       T-Mobile Data project WIFI

               T-mobile Mesh wifi network in Del Rio TX

              Post Process the data and prepared the drive test plots

               Drive test done using Cisco System Expert software

              Troubleshooting interference issues between different channels

 

8/2009 – 10/2009     Nokia BTS Integrator

·         (BTS Integrator) Installed Nokia Ultrasites, Commissioned Nokia BTS and Nokia LMU, Punched down alarm blocks, wire wrapped T1’s, performed Antenna Cut-over with Ericsson TDMA, Integrated Nokia BTS. This contract was involved in Northern Louisiana for complete build-out of Cingulars’ (SALMS) GSM network. My responsibilities were to install various configurations, commission upon completion, install/commission LMU unit and integrate Nokia Ultra sites. During integration process, T1’s were to be wire-wrapped and tested for link establishment—if any problems occurred during testing they were to be resolved or determined while on site if possible with MSC/BSC for proper diagnosis. Integration also did involve Antenna share cabling with Antenna cutover- As Nokia GSM were to Transmit and Receive while providing RX/Div RX to Ericsson TDMA--in some cases Ericsson TDMA provided Div RX to Nokia GSM as a temporary solution to insufficient amount of hard lines available to complete cutover.  Perimeters were also to be temporarily set through Nokia ROC for necessary testing during the integration process and custom settings to BTS were made to compensate (MHA/LNA) hardware installed on pre-existing hard lines. All other tasks involved in this Market were very similar to previous contracts.

 

5/2009 - 7/2009      Nokia Flexi Integrator

·         Responsible for Removal of Nortel BTS and Hot Swap with Nokia BTS as well as installation of new RF jumpers/Connector with passing sweep results using Anritsu. BTS was completely assembled in a Rack and Stack then delivered to field integrators where we then installed, commissioned, and integrated to the existing Network. In some cases cabinets were not configured to match the Data-fill and as a result I had to quickly disassemble and reassemble to correct the fault in order to make the maintenance window. In addition to the field work we were also responsible for pictures and site folder submittals

 

2/2009 – 4/2009      E911 TruePosition LMU Installations and Troubleshooting

·         Install, commission, troubleshoot, test and maintain LMU's at customer cell-sites.             Coordinated with Field Test, Network Design, and Program Management for mission essential           information and deliverables for the deployment of LMU's. Provide proper technical documentation of WLS equipment to PFS. Use of Laptop and ProComm Software

9/2008 – 1/2009       Ericsson BTS 2nd Carrier add on / T1 testing

·         2nd Carrier Kits. Ericsson EDGE radios. Antenna Sharing Units (ASU). LMU E911 (WLS) kits. Andrew Antenna diplexing and ASU with existing TDMA equipment. T1 cross-connects and acceptance. Adding radios, Filters, High Speed Cards, and power supply. T-Berd Spectrum analyzer usage.  Use of Anritsu transmission line sweep gear and ability to analyze results.  Installation and Testing of T-1 circuits with the DACS

2/2008 – 8/2008 - Ericsson BTS Integration/Commissioning

·         Commission Ericsson Node B 3106, 2106 cabinets. OSS, RNC/RXI, Node B, MGw, Moshell 7.0, HyperTerminal, Element Manager experience. Operation and maintenance, and troubleshooting. Integration of Node B/RNC and alarm monitoring. Integration support, O&M and Troubleshooting; RNC3810, RBS3106 Site Integration. Support RBS integration in RNC side.

9/2007 – 1/2008 Turnkey / AT&T

·         Completed Site inspection, and quality control for Remote Terminals. make contacts and set appt for site visits, customer relations. Took quality photos and Used Wysi FIS remote software to upload images and reports. Inspected Alcatel Litespan 2000, Pairgain equip, Fiber panels, Multiplexers, repeater shelves, Isdn shelves, Data Ethernet shelves, OSP Panels in Central Offices

 

9/2006 – 8/2007 CTE/Trueposition LMU

·         Trueposition Certified Installer, Tester, and Maintenance technician, completely installed and programmed     LMU's, installed both the 850 and 1900, in the 2106 outdoor cabinet and indoor shelters, tested the cables using the ANRITSU cable sweeper, installed the GPS antenna, Power, Color code, made and ran cables, installed downlink splitters, connected the T1 through the Kentrox unit and mini circuits, proficient with the PROCOMM PLUS software, TDOA/Scout, responsible for pictures, worked directly with the NOC and the Bridge.....WLS Harvesting....

8/2006 – 9/2006 Teksystems/TNS/Contract

·         DRIVE TESTING, 911 testing, Verify each quadrant, Alpha, Beta, Gamma sections. Entering Results in an Excel format, and relaying to the NOC. TNS-Texas Market. Site survey and Complete Deinstallation of ERICSSON GSM, UMTS, and TDMA equipment. Deinstalled Ericsson 2106, 3106, 2206, 850mhz and 1900mhz bays. Deinstalled TDMA eqmt. Removed GSM/Andrews cables. Removed DC Power plant and Ground cables. Verify Niu cards and circuit ID’s. Telco rack info, 19” and 23” and all components mounted.  DSX info, Model, serial, and asset info, # of ports available. Verify and remove all types of Batteries, Verify Building and Outdoor info. Verify and remove all types of Rectifiers

7/2006 – 8/2006 Teksystems/Contract

·         EXI-Sanfrancisco Market. Installation, Integration and troubleshooting of the Ericsson GSM and UMTS BTS indoor and outdoor equipment. RBS 3106, 2106, 3206, 3303, 2206. Call testing, T1 testing and site surveys, Understand Antenna systems and RF transmissions.  Provide clear, concise reports of technical issues. Provide continuous performance analysis of system and prioritize issues for investigation and resolution. Document system trouble due to RF interference or lack of RF signal strength, recommending system modifications or enhancements to solve or reduce the system interference, and help determine integration plans to implement those changes. Collect, process and analyze drive test data.  Provide drive test data output to IS team for back office integration.

5/2006 – 7/2006 Comsresources/RXAIT/Contract

·         Integration installation and troubleshooting of the 3G Ericsson 3106 UMTS and Ericsson 2106 GSM wireless equipment, also installed Andrews proprietary equipment (duplexers, dual duplexers, and diplexers) which split the 850 MHz GSM and 1900 MHz UMTS signals. Worked directly with the local NOC when troubleshooting and bringing the new system online. Installation of Andrews Connectors.

4/2006- 5/2006 Teksystems/Verizon/Contract

·               T1 installation for HDSL services, verified facilities to run the T1 services, record keeping for any pair change. Closing orders after completion. Worked directly with the CRCC dept, responsible for inventory. Used specialized equipment, T-berd, and Sidekick, as well as a variety of hand tools. 

2/ 2006- 4/2006 Techforce Telecom/ Contract

·            AT@T certified Level 3 installer, responsible for complete installation Tellabs 5500, 5550 and 532L, installed DS1, DS3, T1, and T3 racks. Wire wrapping, Lacing /Stitching, understanding specifications and equipment requirements, knowing color codes, pulling and installing power to the BDFB. DC power certified. Trained with ironwork /bays/equipment rack installation. Installing and terminating fiber to OC3, OC12, OC48 and OC192.

1/ 2006  - 2/ 2006 Atlas Communication/ Telecom Site Surveyor Contract/LMU Installer

·        100% travel. Verify in building layout with Cingular provided cad drawing. Install LMU E911and other additional hardware, GPS/GSM antenna, make and route RF cables, install and ground polyphasers, program LMU, update firmware on LMU, Take pictures of completed site.
Verify coordinates with GPS. DC power plant capacity. Verify commercial AC service, breaker layout and capacity, rectifier layout shelf capacity of cabinet growth, existing BBU, sizing and growth for up to 4-hrs backup. Verify all Telco lines, DSX panel size and capacity, all site antenna jumpers, hatch plate use and capacity, Verify grounding, alarm punch down block, generator plug and layout, safety equipment. Verify site access and any issues

4/ 2005 – 10/ 2005 ATT/Consultant/Network Operations Mgr. Dallas, TX

·         Retains ownership and accountability of the automated maintenance for customer base. Responsible for the overall management of maintenance automation. Monitor AT&T network of T1, T3, ATM, FRAME Relay circuits. Responds to Voice and Data alarm conditions, identifying and resolving problem areas. Responsible for Project Management coordination and escalation of service activities. Utilizes Business Planning procedures to established Vendor needs. Manages the resolution of complex trouble tickets. Negotiates with the customer in relation to customer premise equipment. Escalates network outages with LEC. Implements and manages processes related to detailed testing analysis of systems BMP, TIRKS, SOTS, CCP, RMIN and Netscope.

 

8/2004 – 2/2005 Oklahoma Solutions/Multifunctional Printer Rollout /Contract  

·         Installed the Lexmark 632L printer to the Wal-Mart Smart System. Pulled and punched down CAT-5 cables up to 350 ft. Made connectors using proper color coded connections 

        Tested wall connectivity to the switch. Installed printers on the network and set up DHCP,    BOOTP on the WINS server.

7/2001 – 3/2004 Southwestern Bell /Cable Splicer

·         Installed and tested 1.544 from the frame to the cross box, on to the customer premise. Installed and maintained cable systems and distribution equipment. Utilized engineered drawings, and technical manuals to determine requirements for cable systems. Ensured techniques, materials, and performance were in ordinance with technical standards. Performed pneumatic troubleshooting to locate faulty splice cases. Employed test equipment to determine course of signal deterioration in voice and data circuits.

Technical support/Helpdesk / Southwestern Bell

·         Facilitated Helpdesk phone calls for Tier Two technical support. Documented and managed customer issues in reporting systems. Performed preliminary isolation and troubleshooting of problems. Ensured reproducibility of problem and escalation. Escalated issues based on criticality to Tier Three operational teams. Assisted other members of the support team with diagnosis, review and resolution of customer issues.

 

 

7/2000 – 5/2001 Alltech Technologies / Contract

·         Tested and tuned the Cisco ONS 15800 & 15454 HDWDM Optical systems, Completed network testing, integration and field service support. Performed systems integration testing of voice, data voice level, circuits and video unit. Utilized Network Management System (NMS) program to provisioned optic sub-modules. Provided 24-hour customer support via phone. Conducted training on optic carrier equipment and system characteristics.

MCI Certified Installer/MCI Certified Tester / Contract

·         Certified Level 4 Installer and Tester of Tellabs 5500, 5550, 532L, and Alcatel 1631 Dacs equipment. Responsible for the operation of multiplexers, switching and circuit line conditioning equipment. Responsible for terminal and repeater sites in the MCI network. Performed installation, re-configuration and removal of circuits. Conducted acceptance testing of DS1 through DS3 circuits. Analyzed remote and local alarm conditions to identify equipment faults repairs. Coordinated circuit digital cross-connects with WorldCom and Bell technicians. Provided 24 hours support on call field repairs through the Network Operations Center (NOC). Maintained equipment records, circuit facility assignments and facility drawings.

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Network Engineer

AT&T

5/2005 - Present

 

Education

BACK TO TOP

 

School

Degree

Major

ATI Electronics Institute

Associate Degree

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

5+ to 7 Years

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Yes

Citizenship:

None

 

 

Target Job:

Target Job Title:

Telecom

Desired Job Type:

Employee
Temporary/Contract/Project

Desired Status:

Full-Time
Part-Time
Per Diem

Willing to work the following shifts:

First Shift (day)
Second Shift (afternoon)
Third Shift (night)

Willing to work weekends:

Yes

 

Target Company:

Company Size:

No Preference

Industry:

Computer Hardware

Occupation:

Installation/Maintenance/Repair

·         Computer/Electronics/Telecomm Install/Maintain/Repair

 

Target Locations:

Selected Locations:

US
US-TX-Dallas

Relocate:

No

Willingness to travel:

Up to 100%